TM 5-2590-512-13&P
Section II. MAINTENANCE ALLOCATION CHART FOR EARTH AUGER ASSEMBLY
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
DIRECT
GEN.
Group
Maintenance
UNIT
SUPPORT SUPPORT
DEPOT
Tools and
Number
Component/Assembly
Function
C
O
F
H
D
Equipment
Remarks
Motor Sprocket
Inspect
0.1
Replace
0.8
Hydraulic Motor
Inspect
0.1
Replace
1.1
Repair
1.8
B.
Motor Plate
Inspect
0.1
Replace
1.0
7475
Spindle and Cutter
Auger
Inspect
0.1
Replace
0.1
Auger Teeth
Inspect
0.1
Replace
0.2
C.
Auger Center Point
Inspect
0.1
Replace
0.1
7488
Pipes, Hoses, Valves
Elbows
Inspect
0.1
Replace
0.4
Hoses
Inspect
0.1
Replace
0.3
B-5