DRILL, PNEUMATIC, DRIFTER: BOOM-TYPE; CRAWLER-MOUNTED, SELF-PROPELLEDFigure 1-3.1. Drill control air piping diagram (for units equipped with retrofit kit)Section II. OPERATORS PREVENTIVE MAINTENANCE CHECKS AND SERVICES3-4. Leakage DefinitionsTable 3-1. Operator Preventive Maintenance Checks and Services for Crawler-Mounted Rock Drill LocationSection IV. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICESTable 4-1. Organizational Preventive Maintenance Checks and Services for Crawler-mounted Rock DrillTable 4-1. Organizational Preventive Maintenance Checks and Services for Crawler-mounted Rock Drill (Cont.)CHAPTER 5 MAINTENANCE INSTRUCTIONS FOR UNITS EQUIPPED WITH RETROFIT KITb. Installation5-2. Impact Valve and Manifold Replacement5-3. Feed Motor Hoses and Fittings Replacement5-4. Rotation and Blow Hoses and Fittings Replacement5-5. Impact Valve Hoses and Fittings Replacement5-7. Drifter Drill Replacement5-8. Slabback Replacement5-10. Hose Bulkhead ReplacementSection III. MAINTENANCE OF THE FEED AND LEVELING MECHANISM5-15. Feed Chain Sprockets, Bearings, and Shafts Replacement5-16. Feed Motor and Gearbox Assembly ReplacementAPPENDIX B MAINTENANCE ALLOCATION CHART (MAC) - TM-5-3820-241-12_22B-3. Explanation of Columns in the MAC, SectionB-4. Explanation of Columns in Tool and Test Equipment Requirements, Section IIISection II. MAINTENANCE ALLOCATION CHART FOR RAM-MS-5/450A DRMAINTENANCE ALLOCATION CHART - TM-5-3820-241-12_26MAINTENANCE ALLOCATION CHART - TM-5-3820-241-12_27Section III. TOOLS AND TEST EQUIPMENT FOR RAM-MS-5/450A DRAPPENDIX D EXPENDABLE AND DURABLE ITEMS LISTSECTION II. EXPENDABLE AND DURABLE ITEMS LISTWARNINGDRILL, PNEUMATIC, DRIFTER: SELF PROPELLEDCHAPTER 1 INTRODUCTION - TM-5-3820-241-12_34Figure 1-1. Rock drill assembly, right front, 3/4 view with shipping dimensionsFigure 1-2. Rock drill assembly, left rear, 34 view.1-9. Data PlatesTable 1-1. SPECIFIC TORQUE DATAFigure 1-3. Rock drill feed, ram, air system schematic diagramFigure 1-4. Rock drill, ram and side tram, air system schematic diagramFigure 1-5. Rock, drill, ram system, hydraulic schematic diagramCHAPTER 2 OPERATING INSTRUCTIONS - TM-5-3820-241-12_42Figure 2-1. Controls and instruments (sheet 1 of 3).Figure 2-1. Controls and instruments (sheet 2 of 3)Figure 2-1. Controls and instruments (sheet 3 of 3)Figure 2-2. Main air supply hose, removal and installationFigure 2-3. Stopping the rock drill.Figure 2-5. Engaging the rock drill for trammingFigure 2-6. Tramming the rock drill.b. Positioning Boom and Feed.Figure 2-7. Rock drill steel system installed.Figure 2-8. Drilling operationFigure 2-9. Adding multiple steel lengths.Section III. OPERATION UNDER UNUSUAL CONDITIONS2-12. Operation in Salt Water AreasCHAPTER 3 MAINTENANCE INSTRUCTIONSSection III. OPERATOR/CREW TROUBLESHOOTINGSection IV. MAINTENANCE OF THE FINAL DRIVEFigure 3-1. Transmission tramming brake adjustmentSection V. MAINTENANCE OF HYDRAULIC SYSTEMFigure 3-3. Rock drill pressurized reservoir serviceFigure 3-4. Hydraulic oil reservoir serviceSection VI. MAINTENANCE OF PNEUMATIC SYSTEMFigure 3-6. Bulkhead metering valve adjustmentSection VII. MAINTENANCE OF LIFT, SWING, FEED AND LEVELING MECHANISMSection VIII. MAINTENANCE OF CRAWLER TRACKSCHAPTER 4 ORGANIZATIONAL MAINTENANCE INSTRUCTIONSFigure 4-1. Uncrating the rock drill crawler assemblyFigure 4-2. Lifting the rock drill crawler assembly.Figure 4-3. Removing the rock drill feed assembly from shipping crateFigure 4-4. Rock drill feed assembly, removal and installation (sheet 1 of 2)Figure 4-4. Rock drill feed assembly, removal and installation (sheet 2 of 2)Figure 4-5. Drill and feed control valve, removal and installation (sheet 1 of 2)Figure 4-5. Drill and feel control valve, removal and installation (sheet 2 of 2)Section II. MOVEMENT TO A NEW WORKSITETable 4-1 Organizational Preventive Maintenance Checks and ServicesTable 4-2. ORGANIZATIONAL MAINTENANCE TROUBLESHOOTINGa. General.Figure 4-6. Hydraulic hoses and fittings, removal and installationFigure 4-7. Hydraulic pump shut-off valve, removal and installationSection VII. MAINTENANCE OF THE PNEUMATIC SYSTEMFigure 4-8. Air hose manifold, removal and installationFigure 4-9. Rock drill pneumatic hoses and fittings, removal and installation (sheet 1 of 4)Figure 4-9. Rock drill pneumatic hoses and fittings, removal and installation (sheet 2 of 4).Figure 4-9. Rock drill pneumatic hoses and fittings, removal and installation (sheet 3 of 4)Figure 4-9. Rock drill pneumatic hoses and fittings, removal and installation (sheet 4 of 4).Figure 4-10. Air line lubricator fitting service.Figure 4-12. Air pressure regulator, removal and installationb. Cleaning and InspectionFigure 4-13. Air motor, removal and installationSection Vlll. MAINTENANCE OF THE FEED MECHANISM AND CENTRALIZERb. Cleaning and Inspection.Figure 4-15. Feed chain adjustment.Figure 4-16. Centralizer, removal and installationSection IX. MAINTENANCE OF THE ROCK DRILL FRAMEAPPENDIX A REFERENCESAPPENDIX B MAINTENANCE ALLOCATION CHARTSECTION II. MAINTENANCE ALLOCATION CHARTMAINTENANCE ALLOCATION CHART - TM-5-3820-241-12_99