• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5-16. Boom mechanism, disassembly and reassembly
CHAPTER 6. MAINTENANCE OF THE ROCK DRILL CRAWLER AND CARRIER

Maintenance Manual Drill, Pneumatic Drifter; Boom-Type, Crawler Mounted, Self-Propelled Page Navigation
  64    65    66    67    68  69  70    71    72    73    74  
img
. . . . . . . . . .
TM 5-3820-241-34
(1) Reassemble the boom components in the
Legend for Fig. 5-16:
reverse of numerical sequence as illustrated in
6
Pivot shaft
1 Lubrication fitting
7
Pivot pin
2 Lubrication f i t t i n g
figure 5-16.
8
RH boom
3 Pivot pin
( 2 ) Reassemble the boom tilt and swing
9
Support pivot
4 Spring pin
mechanism in the reverse of numerical sequence
10
Universal joint
5 Spring pin
as illustrated in figure 5-15.
5-22. Boom Pivot Mechanism Cleaning, In-
b. Installation.
spection and Repair
(1) Install the tilt and swing boom assembly
a. Cleaning. Clean all parts with cleaning
(para 2-12).
solvent (FED SPEC PD 680) and dry thoroughly.
(2) Install the feed extension cylinder (para
b. Inspection and Repair.
3-15).
(1) Inspect the boom, boom supports joints,
(3) Install the boom swing cylinder (para 3-
arms and links for cracks breaks or other damage.
13).
(2) Inspect bushings at the pivot points for
(4) Install the feed swing cylinder (para 3-
excessive wear.
10).
( 3 ) Inspect the  h a r d w a r e f o r d a m a g e d
(5) Install the boom lift cylinder (para 3-7).
threads.
(7) Refer to TM 5-3820-241-12 and install the
(4) Repair by replacement of defective parts.
rock drill feed assembly.
(8) Refer to LO 5-3820-241-12 and lubricate
5-23. Boom Pivot Mechanism, Reassembly and
the rock drill.
Installation
a. Reassembly.
5-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.