TM 5-2590-512-13&P
SECTION V. UNIT MAINTENANCE PROCEDURES
4-16. Connecting Link Replacement (Universal Drive Interface).
This task covers:
a. Removal
b. Installation
Initial Setup
Tools:
Equipment Conditions:
General Mechanic's Tool Kit
Auger Drive Unit removed from
5180-00-177-7033
SEE and placed on ground (para. 4-15 c).
Materials and Parts:
One cotter pin
a. Removal.
1.
Remove cotter pin (1) from clevis pin (2).
Discard cotter pin (1)
2.
Remove clevis pin (2) from connecting link
(3).
3.
Remove connecting link (3) from drive unit
(4).
b. Installation.
NOTE
Link (3) can be incorrectly installed
into Auger Drive Unit (4) bracket.
Correct installation requires link pin
stop (5), be located on hydraulic
hose side (6) of Auger Drive Unit
(para 2-7).
1.
Position connecting link (3) into place in
Auger Drive Unit (4). Align holes in
connecting link (3) to holes in Auger Drive
Unit (4). Install oblong head clevis pin (2)
thru side of Auger Drive Unit (4) that has
metal pin stop angle (7) welded in place.
2.
Push clevis pin (2) through holes in both
brackets and ensure oblong clevis pin head
is seated flush with pin stop (7) on Auger
Drive Unit (4).
3.
Insert new cotter pin (1) thru end hole in
clevis pin (2) and spread ends.
FOLLOW ON TASK.
Install Auger Drive Unit on SEE vehicle (para 4-14).
END OF TASK
4-17